South-West Arterial Road Reconstruction and Drainage
Scope: Sheet Piles
Share:
The Project
The Town of Bradford and West Gwillimbury implemented an upgraded road reconstruction which required construction of a double box culvert.
The Challenge
The new box culvert to be constructed serviced the flow of an existing creek bed with soil conditions and banks subject to erosion.
The Solution
Maple Site Solutions Inc. Supplied and installed a sheet pile shoring and scouring protection system to support the existing banks and prevent migration of soils below the new double box culvert.